In brief
LG Energy Solution won its first direct-supply behind-the-meter BESS project for a big tech customer and qualified as an NVIDIA DSX Ready partner, opening AI data center demand for U.S.-made ESS.
LG Energy Solution's growth this quarter came from energy storage (ESS) alongside EV batteries. It secured its first direct-supply behind-the-meter BESS project for a big tech customer and qualified as an NVIDIA DSX Ready BESS partner. In EVs, it increased volumes and extended supply periods under existing contracts for high-voltage mid-nickel Gen2 products in Europe, while 21- and 46-Series cylindrical batteries kept shipping. Its Arizona link line was completed and the GM JV plant resumed operations.
Management is steering toward U.S.-made ESS, targeting over 70 GWh of North American ESS capacity and over 20 GWh of cylindrical capacity by end-2027. It will convert EV pouch lines to ESS, add prismatic lines, and diversify non-PFE supply. The tension is that this depends on supportive U.S. and EU rules still being finalized, softer BEV demand, and a large conversion of capacity.
No call transcript for this quarter, so this summary also draws on: The Korea Times ↗, The Herald Business (Herald Corp) ↗.
Slides & documents
Open the slide deck (PDF, 15 pages) ↗
Showing the first 6 of 15 pages.
Results documents
Key numbers
- Revenue
- KRW 9.6 trillion
- Operating profit
- KRW 756 billion
- Operating margin
- 7.8%
- Gross margin
- 23.5%
- Net income
- -297.0B
- Cash flow from operating activities
- -338.0B
up 27.6% from the prior quarter
| Segment or metric | Value | Change |
|---|---|---|
| North America production incentive (in revenue) | KRW 416.9 billion | |
| EBITDA | 2.0T |
Where each number comes from
- Revenue: “LG Energy Solution posts KRW 9.6 trillion in consolidated revenue and KRW 756 billion in operating profit in Q3 2026”
- Operating profit: “LG Energy Solution posts KRW 9.6 trillion in consolidated revenue and KRW 756 billion in operating profit in Q3 2026”
- Operating margin: “The operating profit was KRW 756 billion, with the operating profit margin at 7.8%.”
- Gross margin: “(%) 21.9% 24.6% 29.9% 17.0% 23.2% 18.9% 20.4% 23.5% SG&A 1,095 1,001 1,211 1,226 4,533 1,449 1,432 1,507”
- Net income: “Net Income 227 91 536 (772) 81 (944) (329) (297) (%) 3.4% 1.5% 8.8% (11.9%) 0.3% (14.4%) (4.3%) (3.1%)”
- Cash flow from operating activities: “Cash Flow from 1,162 250 1,267 1,753 4,432 (316) 25 (338) Operating Activities Operating Profit 375 492 601 (122)”
- North America production incentive (in revenue): “The revenue includes the North America production incentive of KRW 416.9 billion, reflecting volume growth led by increased ESS shipments in the region.”
- EBITDA: “EBITDA 1,231 1,375 1,519 913 5,037 887 1,330 1,972 (%) 18.3% 22.7% 25.0% 14.1% 19.9% 13.5% 17.6% 20.5%”
Copied from the press release ↗ and other documents in the company's results page ↗. A figure is published only if its sentence is in those documents.
Outlook
| Metric | Period | Outlook |
|---|---|---|
| North America ESS battery capacity | end-2027 | over 70 GWh |
| North America cylindrical battery capacity | end-2027 | over 20 GWh |
Key takeaways
First direct big tech BESS project secured
LG Energy Solution won its first direct-supply behind-the-meter BESS project for a big tech customer, showing it can supply non-PFE products locally. It says this opens the door to more AI data center projects where supply chain security is critical.
NVIDIA DSX Ready qualification targets AI data centers
The company qualified as an NVIDIA DSX Ready BESS partner, backed by its high-capacity LFP-based AC Link solution and in-house system integration. This positions it for AI data center storage demand.
North American ESS capacity to exceed 70 GWh
It will convert more EV pouch lines to ESS and add prismatic lines to reach over 70 GWh by end-2027. A U.S. executive order on grid security supports demand for locally produced ESS.
Cylindrical batteries expand in U.S. and Europe
U.S. production of 46-Series cells is planned by end-2026, with tabless 2170 lines for HEVs from 2027, reaching over 20 GWh. In Europe it plans local 46-Series lines by 2029, enabling local supply of both pouch and cylindrical cells.
Non-PFE supply chain and new chemistries built out
It diversified LFP cathode suppliers and signed long-term lithium supply deals: 240k t Canadian lithium concentrate (4 yrs) and 80k t U.S. lithium carbonate (10 yrs). It also aims to make sodium-ion samples this year for proof-of-concept testing with a key ESS customer.
Questions
What was LG Energy Solution's main product win this quarter?
It secured its first direct-supply behind-the-meter BESS project for a big tech customer and qualified as an NVIDIA DSX Ready BESS partner. It expects this to open additional AI data center projects.
How is LG Energy Solution expanding North American capacity?
It plans over 70 GWh of ESS capacity and over 20 GWh of cylindrical capacity by end-2027. ESS growth comes from converting EV pouch lines and adding prismatic lines.
What is happening in its EV business?
It increased volumes and extended supply periods under existing contracts for high-voltage mid-nickel Gen2 products in Europe. Poland utilization improved and the GM JV plant resumed operations, though it notes softer BEV demand with HEV/EREV opportunities.
How is regulation shaping its strategy?
A U.S. executive order on grid security supports demand for locally produced ESS, and proposed EU Industrial Accelerator Act revisions emphasize regional production. Final EU legislation is targeted for H1 2027.
What new products and chemistries is it developing?
It aims to produce sodium-ion samples this year for proof-of-concept testing with a key ESS customer and to enter new applications with high-power LFP 2170 batteries next year. It is also developing non-PFE supply chains for sodium-ion and LMR batteries.