OpenNashEarnings

Exelon (EXC) · Utilities

Exelon Q2 2026 earnings: summary, key numbers & outlook

Results filed 30 Jul 2026 · Quarter ended 30 Jun 2026

Press release ↗Investor relations ↗

Summaries and transcripts are machine-generated and can contain errors.

In brief

Exelon pairs a data-center and transmission pipeline with utility-owned battery storage and virtual power plants as it pursues affordable, reliable power amid surging demand.

Exelon's six regulated utilities filed new storage proposals, including a transmission-connected battery system of up to 500 MW at Atlantic City Electric built with Invenergy. ComEd won approval to launch its first virtual power plant program, expected by March 2027. BGE filed an electric distribution rate case, and all utilities project top quartile reliability. Data-center demand is the main growth driver, with about 11 GW of high-probability load.

Management is steering toward more transmission, storage and virtual power plants, with $12-17B of transmission opportunity beyond its $41.7B capital plan. The tension is affordability: new rate cases, large-load protections and rising customer costs must coexist with heavy investment. Some storage and transmission projects are still awaiting regulatory approval, and the plan relies on about $3.4B of new equity through 2029.

No call transcript for this quarter, so this summary also draws on: The Motley Fool ↗.

Key numbers

GAAP EPS · GAAP
$0.39

relatively consistent with the prior period at $0.39 per share

Adjusted operating EPS · non-GAAP
$0.43

up from $0.39 in the second quarter of 2025

Operating revenues · GAAP
$6.0B

up from $5,427 a year ago

Operating income · GAAP
$979.0M

up from $927 a year ago

Net income · GAAP
$396.0M

up from $391 a year ago

Operating cash flow (six months) · GAAP
3.7B

up from 2,711 a year ago

Segment or metricValueChange
ComEd adjusted operating earnings$249.0Mup from $228 million
PECO adjusted operating earnings$130.0Mdown from $136 million
BGE adjusted operating earnings$70.0Mup from $55 million
PHI adjusted operating earnings$126.0Mdown from $144 million
Where each number comes from
  • GAAP EPS: “Exelon's GAAP net income for the second quarter of 2026 remained relatively consistent with the prior period at $0.39 per share.”
  • Adjusted operating EPS: “Adjusted (non-GAAP) operating earnings for the second quarter of 2026 increased to $0.43 per share from $0.39 per share in the second quarter of 2025.”
  • Operating revenues: “Three Months Ended June 30, 2026 Operating revenues | $1,985 | $1,062 | $1,218 | $1,712 | $(10) | $5,967”
  • Operating income: “Total operating expenses | 1,551 | 876 | 1,100 | 1,483 | (22) | 4,988 Gain on sale of assets | — | — | — | — | — | — Operating income | 434 | 186 | 118 | 229 | 12 | 979”
  • Net income: “Net income (loss) attributable to common shareholders | $249 | $119 | $55 | $109 | $(136) | $396”
  • Operating cash flow (six months): “Net cash flows provided by operating activities | 3,669 | 2,711 Cash flows from investing activities Capital expenditures | (4,558) | (3,959)”
  • ComEd adjusted operating earnings: “ComEd's Adjusted (non-GAAP) operating earnings for the second quarter of 2026 increased to $249 million from $228 million in the second quarter of 2025”
  • PECO adjusted operating earnings: “PECO's Adjusted (non-GAAP) operating earnings for the second quarter of 2026 decreased to $130 million from $136 million in the second quarter of 2025”
  • BGE adjusted operating earnings: “BGE's Adjusted (non-GAAP) operating earnings for the second quarter of 2026 increased to $70 million from $55 million in the second quarter of 2025”
  • PHI adjusted operating earnings: “PHI's Adjusted (non-GAAP) operating earnings for the second quarter of 2026 decreased to $126 million from $144 million in the second quarter of 2025”

Copied from the press release ↗ and other documents in the SEC filing ↗. A figure is published only if its sentence is in those documents.

XBRL figures for this quarter arrive with the 10-Q or 10-K; the numbers above are from the press release.

Outlook

MetricPeriodOutlook
Adjusted operating EPSfull year 2026$2.81-$2.91 per share

Key takeaways

  1. ACE proposes up to 500 MW battery storage

    Atlantic City Electric, partnered with Invenergy, filed a utility-owned storage project for construction by late 2030. It was submitted to PJM's queue and to the New Jersey Board of Public Utilities, with no customer bill impact projected through at least 2035.

  2. Virtual power plants gain regulatory approval

    The ICC approved ComEd's Scheduled Dispatch VPP, expected to launch by March 2027, and 173.5 MW was approved for BGE and Pepco Holdings pilots. This extends Exelon's role from delivering power to orchestrating customer-owned flexibility.

  3. Data-center pipeline anchored by Transmission Security Agreements

    About 11 GW of high-probability data-center load is in advanced design or backed by FERC-approved agreements, with about 40% of ComEd's near-term load under such agreements backed by about $1B in collateral. FERC endorsed the framework, which filters out speculative projects and protects existing customers.

  4. Transmission opportunity extends beyond the plan

    Exelon sees $12-17B of transmission opportunity beyond its plan, including $1.2B of investment approved in PJM's RTEP Window #1 and a $1B+ MISO Tranche 2.1 project. Data centers, generator deactivations and congestion are driving the need.

  5. BGE files electric rate case amid affordability pressure

    BGE requested a $156 million increase in July, with a decision expected in the first quarter of 2027. Pepco Maryland and DPL Delaware cases remain on track, so regulators' response will shape how Exelon balances investment against bills.

Charts

Revenue$7.2B+7.9% y/yQ1 2026
Q2 2024: $5.4BQ2 ’24$5.4BQ3 2024: $6.2BQ3 ’24$6.2BQ4 2024: $5.5B (worked out from the annual figure)Q4 ’24$5.5BQ1 2025: $6.7BQ1 ’25$6.7BQ2 2025: $5.4BQ2 ’25$5.4BQ3 2025: $6.7BQ3 ’25$6.7BQ4 2025: $5.4B (worked out from the annual figure)Q4 ’25$5.4BQ1 2026: $7.2BQ1 ’26$7.2B

Fourth quarter worked out from the annual figure.

Data
Q2 2024$5.4B
Q3 2024$6.2B
Q4 2024$5.5B *
Q1 2025$6.7B
Q2 2025$5.4B
Q3 2025$6.7B
Q4 2025$5.4B *
Q1 2026$7.2B
Diluted EPS (GAAP)$0.90+0.0% y/yQ1 2026
Q2 2024: $0.45Q2 ’24$0.45Q3 2024: $0.70Q3 ’24$0.70Q1 2025: $0.90Q1 ’25$0.90Q2 2025: $0.39Q2 ’25$0.39Q3 2025: $0.86Q3 ’25$0.86Q1 2026: $0.90Q1 ’26$0.90
Data
Q2 2024$0.45
Q3 2024$0.70
Q1 2025$0.90
Q2 2025$0.39
Q3 2025$0.86
Q1 2026$0.90

Fourth-quarter EPS appears once the press release is read; filings report it only for the full year.

Operating margin22.2%−0.7 pts y/yQ1 2026
Q2 2024: 17.0%Q2 ’2417.0%Q3 2024: 19.4%Q3 ’2419.4%Q4 2024: 20.1%Q4 ’2420.1%Q1 2025: 22.9%Q1 ’2522.9%Q2 2025: 17.1%Q2 ’2517.1%Q3 2025: 22.4%Q3 ’2522.4%Q4 2025: 21.9%Q4 ’2521.9%Q1 2026: 22.2%Q1 ’2622.2%
Data
Q2 202417.0%
Q3 202419.4%
Q4 202420.1%
Q1 202522.9%
Q2 202517.1%
Q3 202522.4%
Q4 202521.9%
Q1 202622.2%
Free cash flow-$634.0M+15.0% y/yQ1 2026
Q2 2024: -$237.0MQ2 ’24-$237.0MQ3 2024: -$6.0MQ3 ’24-$6.0MQ4 2024: -$510.0MQ4 ’24-$510.0MQ1 2025: -$746.0MQ1 ’25-$746.0MQ2 2025: -$502.0MQ2 ’25-$502.0MQ3 2025: $163.0MQ3 ’25$163.0MQ4 2025: -$1.2BQ4 ’25-$1.2BQ1 2026: -$634.0MQ1 ’26-$634.0M
Data
Q2 2024-$237.0M
Q3 2024-$6.0M
Q4 2024-$510.0M
Q1 2025-$746.0M
Q2 2025-$502.0M
Q3 2025$163.0M
Q4 2025-$1.2B
Q1 2026-$634.0M

Operating cash flow minus capital expenditure, from cash flow statements.

Questions

What storage project did Exelon announce this quarter?

Atlantic City Electric, partnered with Invenergy, proposed up to 500 MW of utility-owned battery storage in New Jersey, targeted for construction by late 2030. It was submitted to PJM's interconnection queue and filed with the New Jersey Board of Public Utilities.

How is Exelon approaching data-center demand?

It uses Transmission Security Agreements that require signed commitments and collateral, which FERC has endorsed as a model. Exelon cites about 11 GW of high-probability data-center load across ComEd and the Mid-Atlantic.

What are virtual power plants doing at Exelon?

ComEd's Scheduled Dispatch VPP was approved by the ICC and is expected to launch by March 2027. BGE and Pepco Holdings have 173.5 MW approved for pilots.

Where is Exelon looking for growth beyond its current capital plan?

Management points to $12-17B of transmission opportunity beyond the plan, including competitive projects in and outside PJM and a $1B+ MISO Tranche 2.1 project.

What regulatory decisions are coming up?

BGE's electric rate case decision is expected in the first quarter of 2027, and Pepco Maryland's order is expected in August 2026. ComEd's grid plan order is expected by December 15, 2026.

Documents

SEC filing