BHP held full-year production guidance despite two fatalities and a copper dip, while advancing Escondida's New Concentrator, Copper South Australia's growth plan and the Jansen potash project.
BHP's copper output fell 19% as planned lower grades, maintenance, Chilean storms, safety stoppages and a conveyor failure at Carrapateena all hit volumes. Iron ore and coal did better: WAIO set mine and port records for the quarter, and BMA and NSW Energy Coal both produced more than a year earlier. Two employees died, at Escondida and Peak Downs, and operations paused at both sites.
Management is steering toward copper and potash growth. It approved US$0.8 bn of pre-commitment funding for the Escondida New Concentrator, targets Copper South Australia output of ~500ktpa by 2035, and says Jansen Stage 1 is 87% complete for mid-2027 first production. The tension is execution: copper grades are declining, Spence ore variability persists, and safety performance has to improve while major projects ramp up.
Key numbers
- Copper production
- 401 kt
- Iron ore production
- 66.5 Mt
down 19% from Q1 FY26
up 4% from Q1 FY26
| Segment or metric | Value | Change |
|---|---|---|
| Escondida copper | 252.6 kt | down 23% from Q1 FY26 (100% basis) |
| WAIO iron ore | 64.3 Mt | up 4% from Q1 FY26 |
| BMA steelmaking coal | 4.9 Mt | up 1% from Q1 FY26 |
| NSWEC energy coal | 4.4 Mt | up 26% from Q1 FY26 |
Where each number comes from
- Copper production: “Total copper production decreased 19% to 401 kt.”
- Iron ore production: “Iron ore production increased 4% to 66.5 Mt.”
- Escondida copper: “Escondida 252.6 kt ê23% (100% basis) A fatal incident involving one of our employees occurred at Escondida on 23 September.”
- WAIO iron ore: “WAIO 64.3 Mt é4% | 71.9 Mt (100% basis) Production increased as a result of strong operational performance across our mine, rail and port operations”
- BMA steelmaking coal: “BMA 4.9 Mt é1% | 9.8 Mt (100% basis) Production increased reflecting strong operational performance and mine sequencing.”
- NSWEC energy coal: “NSWEC 4.4 Mt é26% Production increased driven by higher bypass coal as mining progressed into lower strip ratio areas and improved wash plant throughput.”
Copied from the press release ↗ and other documents in the SEC filing ↗. A figure is published only if its sentence is in those documents.
Outlook
| Metric | Period | Outlook |
|---|---|---|
| Copper production | FY27 | 1,650 and 1,800 kt |
| Escondida copper production | FY27 | 1,000 and 1,100 kt |
| Escondida concentrator feed grade | FY27 | ~0.70% |
| Iron ore production | FY27 | 260 and 272 Mt |
| BMA steelmaking coal production | FY27 | 18.5 and 20.5 Mt |
Key takeaways
Escondida New Concentrator moves toward execution
US$0.8 bn (100% basis) of pre-commitment funding was approved for further engineering, permitting and execution readiness. This keeps BHP's largest copper growth option advancing.
Copper South Australia gets a long-term growth target
BHP aims to grow Copper SA to ~500ktpa by 2035 and up to 650ktpa by 2040, and raised Olympic Dam's mineral resource base. Further detail is promised at the November site visit.
Jansen potash is on track for mid-2027
Stage 1 is 87% complete, targeting first production in mid-CY27, and Stage 2 is 18% complete. Potash will add a new commodity to BHP's portfolio.
WAIO is building capacity despite maintenance
WAIO set Q1 mine and port records while rebuilding Car Dumper 4, which cost 1.4 Mt (100% basis). The sixth car dumper and Western Ridge Crusher support the >305 Mt target by end of FY28.
Partnerships extend copper and low-emissions options
BHP signed an MOU with KGHM on Spence and Sierra Gorda, raised its Faraday stake to 32%, and piloted selling lower-emissions copper credits to AWS from Escondida.
Questions
What is BHP's main copper growth plan?
BHP approved US$0.8 bn of pre-commitment funding for the Escondida New Concentrator and aims to lift Copper South Australia to ~500ktpa by 2035 and up to 650ktpa by 2040. It also increased Olympic Dam's mineral resource base.
Why did copper production fall in the quarter?
Output fell 19% on planned lower feed grades, scheduled maintenance, severe weather in Chile, safety stoppages and the Carrapateena conveyor failure. FY27 copper guidance of 1,650 to 1,800 kt is unchanged.
How is Jansen potash progressing?
Stage 1 is 87% complete and on track for first production in mid-CY27. Stage 2 is 18% complete, with first production targeted for late-FY31.
What is happening at WAIO and in iron ore?
WAIO set Q1 records at both mine and port while rebuilding Car Dumper 4, which is about 40% complete and due in H1 FY27. Investments including CD6 and the Western Ridge Crusher support production of >305 Mt by the end of FY28.
What partnerships and deals did BHP announce?
BHP signed an MOU with KGHM to explore collaboration at Spence and Sierra Gorda and divested San Manuel to Faraday, lifting its Faraday interest to 32%. It also partnered with AWS on a pilot selling credits for lower-emissions Escondida copper.