General Dynamics (GD) · Aerospace
General Dynamics Q2 2026 earnings: summary, key numbers & outlook
Results filed 29 Jul 2026 · Quarter ended 5 Jul 2026
Slides (10 pages)Press release ↗Investor relations ↗
Summaries and transcripts are machine-generated and can contain errors.
In brief
General Dynamics' backlog rose to $136.5 billion as Combat Systems orders surged and Gulfstream delivered its 100th G700, pointing to demand that is outpacing output.
Orders were strong in every segment, with a 1.4-to-1 book-to-bill. Combat Systems booked 2.1x, including $1.4B from Canada for armored combat support vehicles, $850M for next-gen Abrams engineering services and $850M for munitions. Marine Systems won $2.3B of long-lead Virginia-class Block VI material and an additional John Lewis-class oiler. Gulfstream delivered 41 aircraft and its 100th G700, and Aerospace booked 1.5x.
Management says it is investing heavily to raise output and meet strong, growing demand, with a focus on executing faster against backlog. Aerospace and Marine Systems are showing improving performance. The tension is converting a much larger backlog into deliveries: Combat Systems revenue was flat while its backlog grew 77%, and the 2026 plan holds Gulfstream deliveries at about 160 aircraft.
Slides & documents
Open the slide deck (PDF, 10 pages) ↗
Showing the first 6 of 10 pages.
From General Dynamics investor relations
SEC filing
Key numbers
- Revenue · GAAP
- $14.1 billion
- Diluted EPS · GAAP
- $4.24
- Net earnings · GAAP
- $1.2B
- Operating earnings · GAAP
- $1.5 billion
- Operating margin · GAAP
- 10.4%
- Net cash from operating activities · GAAP
- $1.9 billion
- Free cash flow · non-GAAP
- $1.6B
- Backlog
- $136.5 billion
up 8.1% versus prior year
up 13.4% versus prior year
up 14.4%
up 11.9% from the year-ago quarter
a 40-basis-point expansion from the year-ago quarter
162% of net earnings
up from $1,400 a year ago
up 31.7% from a year ago
| Segment or metric | Value | Change |
|---|---|---|
| Aerospace revenue | $3.5B | up 15.1% |
| Marine Systems revenue | $4.7B | up 10.4% |
| Combat Systems revenue | $2.3B | up 0.3% |
| Technologies revenue | $3.6B | up 4.1% |
| Gulfstream aircraft deliveries | 41 | up from 38 |
| Total backlog | $136.5 billion | up 31.7% |
| Total estimated contract value | $186.9 billion | up 16.0% |
Where each number comes from
- Revenue: “Revenue $14.1 billion, up 8.1% versus prior year •Diluted EPS $4.24, up 13.4% versus prior year”
- Diluted EPS: “Diluted EPS $4.24, up 13.4% versus prior year •$1.9 billion cash from operating activities, 162% of net earnings”
- Net earnings: “Provision for income tax, net | (247) | (218) | (29) Net earnings | $1,160 | $1,014 | $146 | 14.4%”
- Operating earnings: “reported second-quarter 2026 operating earnings of $1.5 billion, and $4.24 per diluted share (EPS), on revenue of $14.1 billion”
- Operating margin: “Operating margin of 10.4% was a 40-basis-point expansion from the year-ago quarter.”
- Net cash from operating activities: “Net cash provided by operating activities in the quarter totaled $1.9 billion, or 162% of net earnings.”
- Free cash flow: “Free cash flow (a) | $1,646 | $1,400 | $3,598 | $1,110 July 5, 2026 | December 31, 2025 Net debt:”
- Backlog: “Backlog at the end of the quarter was $136.5 billion.”
- Aerospace revenue: “Revenue: Aerospace | $3,525 | $3,062 | $463 | 15.1% Marine Systems | 4,660 | 4,220 | 440 | 10.4%”
- Marine Systems revenue: “Revenue: Aerospace | $3,525 | $3,062 | $463 | 15.1% Marine Systems | 4,660 | 4,220 | 440 | 10.4%”
- Combat Systems revenue: “Marine Systems | 4,660 | 4,220 | 440 | 10.4% Combat Systems | 2,290 | 2,283 | 7 | 0.3% Technologies | 3,619 | 3,476 | 143 | 4.1%”
- Technologies revenue: “Marine Systems | 4,660 | 4,220 | 440 | 10.4% Combat Systems | 2,290 | 2,283 | 7 | 0.3% Technologies | 3,619 | 3,476 | 143 | 4.1%”
- Gulfstream aircraft deliveries: “Gulfstream Aircraft Deliveries (units): Large-cabin aircraft | 35 | 32 | 66 | 62 Mid-cabin aircraft | 6 | 6 | 13 | 12 Total | 41 | 38 | 79 | 74”
- Total backlog: “Backlog at the end of the quarter was $136.5 billion.”
- Total estimated contract value: “Total estimated contract value, the sum of backlog plus estimated potential contract value, was $186.9 billion.”
Copied from the press release ↗ and other documents in the SEC filing ↗. A figure is published only if its sentence is in those documents.
| From the filing | Q2 2026 | vs year ago | vs last quarter |
|---|---|---|---|
| Revenue | $14.1B | +8.1% | +4.5% |
| Operating income | $1.5B | +11.9% | +2.8% |
| Net income | $1.2B | +14.4% | +3.1% |
| Operating margin | 10.4% | +0.4 pts | −0.1 pts |
Calculated by code from XBRL, not by the model.
Outlook
| Metric | Period | Outlook |
|---|---|---|
| Diluted EPS | 2026 | $16.80 – $16.90 |
| Consolidated revenue | 2026 | ≈ $55.7 |
| Consolidated operating margin | 2026 | ≈ 10.5% |
| Aerospace revenue | 2026 Aerospace | ≈ $13.8 |
| Aerospace operating margin | 2026 Aerospace | ≈ 14.7% |
| Gulfstream deliveries | 2026 | ≈ 160 deliveries |
| Marine Systems revenue | 2026 Marine Systems | ≈ $18.0 |
| Combat Systems revenue | 2026 Combat Systems | ≈ $9.8 |
Key takeaways
Combat Systems orders surged on international and Army awards
Book-to-bill was 2.1x with every business unit at or above 1.5x, including $1.4B from Canada for armored combat support vehicles and $850M for next-gen Abrams engineering services. Backlog is up 77% year over year, which signals multi-year demand.
Gulfstream hit 100 G700 deliveries
Gulfstream delivered the 100th G700, and Aerospace book-to-bill was 1.5x. Orders were $5,278 million against $3,062 million of revenue...
Submarine and oiler awards deepen Navy shipbuilding load
Marine Systems won $2.3B of long-lead Virginia-class Block VI material and $856M for an additional John Lewis-class T-AO oiler. Revenue rose on higher volume across all shipyards, with backlog up 23%.
Management is investing to raise output
Management said it is making significant investments to increase output to meet strong and growing demand. Capital expenditures were $234 million in the quarter, up from $198 million a year ago.
Full-year outlook raised across segments
EPS guidance moved to $16.80 – 16.90 from $16.10 – 16.20 in January. Marine Systems, Combat Systems and Technologies revenue outlooks were also raised, while Gulfstream deliveries are held at about 160.
Charts
Fourth quarter worked out from the annual figure.
Data
| Q4 2024 | $13.3B * |
| Q1 2025 | $12.2B |
| Q2 2025 | $13.0B |
| Q3 2025 | $12.9B |
| Q4 2025 | $14.4B * |
| Q1 2026 | $13.5B |
| Q2 2026 | $14.1B |
| Q3 2026 | $14.6B |
Data
| Q4 2024 | 10.7% |
| Q1 2025 | 10.4% |
| Q2 2025 | 10.0% |
| Q3 2025 | 10.3% |
| Q4 2025 | 10.1% |
| Q1 2026 | 10.5% |
| Q2 2026 | 10.4% |
| Q3 2026 | 10.5% |
Data
| Q4 2024 | $1.8B |
| Q1 2025 | -$290.0M |
| Q2 2025 | $1.4B |
| Q3 2025 | $1.9B |
| Q4 2025 | $952.0M |
| Q1 2026 | $2.0B |
Operating cash flow minus capital expenditure, from cash flow statements.
Questions
What drove demand in Combat Systems this quarter?
Book-to-bill was 2.1x with all business units at or above 1.5x, including $1.4B from Canada for armored combat support vehicles and $850M from the U.S. Army for next-gen Abrams engineering services. Backlog is up 77% year over year.
How is Gulfstream doing?
Gulfstream delivered 41 aircraft in the quarter and its 100th G700. Aerospace book-to-bill was 1.5x, and backlog is up 20% year over year.
What shipbuilding work did Marine Systems win?
It was awarded $2.3B for long-lead Virginia-class Block VI material and $856M for construction of an additional John Lewis-class T-AO oiler. Backlog is up 23% year over year.
Is General Dynamics expanding capacity?
Management said it is making significant investments to increase output to meet strong and growing demand. Capital expenditures were $234 million in the quarter.
Did General Dynamics change its 2026 outlook?
Yes. Diluted EPS guidance is now $16.80 – 16.90, versus $16.10 – 16.20 in January, and Marine Systems, Combat Systems and Technologies revenue outlooks were raised. Gulfstream deliveries remain about 160.





