0:20:47 · Jim Schneider, Goldman Sachs · 2027 outlook
How confident is KLA that it can outgrow the roughly 30% wafer equipment growth expected in calendar 2027?
Management says supply is improving, leading-edge and DRAM greenfield investment and advanced packaging set up well, and it feels confident in its guidance. — Rick Wallace
0:23:23 · Jim Schneider, Goldman Sachs · 2027 shape
Will 2027 growth be evenly spread or back-half loaded?
Management expects sequential growth for several quarters and a more linear path without a big half-to-half jump.
0:24:03 · Harlan Sur, JPMorgan · Gross margin
Can gross margin return to 63% or higher given new platforms, volume and pricing?
Management expects to be consistent with the 63% to 64% model by mid-to-late 2027 into 2028, as memory work, scale and pricing offset cost headwinds. — Brent Higgins
0:26:06 · Harlan Sur, JPMorgan · Legacy nodes
Are mature and specialty nodes contributing to growth next year?
Management sees some recovery and modest growth in legacy markets, but says growth is driven by the leading edge, where process control intensity is higher. — Rick Wallace
0:28:25 · Analyst, Cantor Fitzgerald · Process control margin
When can process control gross margin return to the mid-60s as memory contracts roll over?
On consistent mix, margins can trend there in the second half of 2027, as new deals carry new pricing and systems use less memory. — Brent Higgins, Rick Wallace
0:30:18 · Analyst, Cantor Fitzgerald · Lead times
What are lead times doing and how is KLA preparing supply and hiring for a multi-year cycle?
Lead times average about 12 months and are extending, and KLA is adding headcount, expanding factories and investing with optics suppliers. — Rick Wallace, Brent Higgins
0:32:40 · Timothy Arcuri, UBS · Share gains
Will KLA outgrow wafer equipment and gain share in 2027?
Management says the first half of 2026 was supply-limited, feels good about 2027, and believes it can outgrow the market next year. — Rick Wallace
0:34:56 · Timothy Arcuri, UBS · DRAM
Why is DRAM revenue up so sharply in December?
Inspection intensity is rising as customers value yield, and new greenfield fabs are an accelerant. — Rick Wallace, Brent Higgins
0:37:20 · Krish Sankar, TD Cowen · Outperformance
If the drivers are the same, why will KLA outperform wafer equipment in 2027?
The first half of 2026 was held back by supply rather than demand, and packaging and new fabs add growth. — Rick Wallace, Brent Higgins
0:39:03 · Krish Sankar, TD Cowen · WFE ceiling
How high could wafer equipment spending go, with some saying $300 billion could be a peak?
Management will not guide a new 2030 number but calls the $220 billion plus or minus $20 billion Investor Day view conservative. — Brent Higgins
0:41:37 · Analyst, Bernstein Research · 2030 model
Why isn't KLA reaching its 2030 target model revenue sooner given 2027 wafer equipment levels?
The model assumed service growth, non-semi growth and share rising from about 7.5% to closer to 9% of wafer equipment, which have not been reached yet. — Brent Higgins
0:43:40 · Analyst, Bernstein Research · Incremental margin
Should incremental operating margin be structurally above the 40% to 50% range?
It depends on growth: normal growth gives the midpoint, while faster growth lands at or above the top end. — Brent Higgins
0:45:08 · Joe Quattrochi, Wells Fargo · Capex
What drove the record capital expenditures in the quarter?
A significant land purchase in India for a new campus, with capex expected to rise to $600 million to $800 million per year. — Brent Higgins
0:46:09 · Joe Quattrochi, Wells Fargo · Services
Will services grow at the high end of the long-term range in 2027?
Yes, management sees no reason it wouldn't, given the installed base growth and high utilization. — Brent Higgins
0:47:17 · Melissa Weathers, Deutsche Bank · Supply chain
How far along is KLA's supply expansion and is further tightening a risk?
Optical components set shipment volumes and have the longest lead times, but KLA has visibility and manages small issues as they arise. — Rick Wallace
0:49:15 · Melissa Weathers, Deutsche Bank · Supply limits
Is the December outlook supply constrained, and is the $200 billion wafer equipment view too?
Management says it could have shipped more this year, but incremental supply is coming online and informs the guidance. — Brent Higgins, Rick Wallace
0:51:00 · Analyst, Wolfe Research · 2028 capacity
For 2028, are the bottlenecks at KLA or in its supply chain, and what might impede growth?
Management says bottlenecks move around, including customer clean rooms, power and construction, and KLA aims not to be the constraint. — Rick Wallace, Brent Higgins
0:55:01 · Analyst, Wolfe Research · China
What are the expectations for China revenue in the December quarter and next year?
China falls in the December quarter to the 27% to 29% range for the year and drops to the low 20s percent in 2027. — Brent Higgins
0:56:36 · Shane Bretman, Morgan Stanley · Advanced packaging
How is advanced packaging demand developing across KLA's products? (the question audio is garbled in the transcript)
Macro products remain the workhorse, but hybrid bonding is moving demand toward higher-end laser scanning and some Gen 4 systems.
0:59:12 · Shane Bretman, Morgan Stanley · Logic share
Does KLA expect share gains from 2 nanometer to 1.4 nanometer logic?
Management feels good about growing share node to node, helped by e-beam inspection and its link to optical, though it gave no specific figure.
1:00:17 · Tim Schultz-Millander, Rothschild & Co. Redburn · Node mix
How does the mix of established-node capex change from 2026 to 2027?
2027 brings more 2 nanometer and 3 nanometer investment plus some 1.4 nanometer, versus a mostly 3 nanometer 2026. — Rick Wallace
1:01:27 · Tim Schultz-Millander, Rothschild & Co. Redburn · Memory costs
What is KLA's purchasing strategy for memory in 2027?
KLA has secured the supply it needs for the coming period but remains exposed to higher memory prices. — Brent Higgins