# Yangzijiang Shipbuilding (BS6) FY2025 earnings

Results filed 2026-02-25 for the quarter ended 2025-12-31. Source page: https://earnings.opennash.com/companies/yangzijiang-shipbuilding/2025-q4/
Press release and documents: https://links.sgx.com/1.0.0/corporate-announcements/Q6SS5EC3E8G7V1QB/875964_Announcement_Full2025_final.pdf
> Summaries and transcripts are machine-generated and can contain errors.

## In brief

Yangzijiang Shipbuilding's order intake recovered in the second half of 2025, leaving a US$22.4 billion orderbook for 245 vessels running to 2030 as it prices remaining 2029 slots and opens 2030.

Yangzijiang Shipbuilding delivered 56 vessels, meeting its target, and won US$2.5 billion of new contracts, about 80% of them in the second half after tariff uncertainty had delayed shipowners' decisions. The product mix shifted toward oil tankers and gas carriers while containerships stayed the largest part of the orderbook. Customers were concentrated in Europe, with Greece, France and Denmark growing as markets.
Management is steering toward filling the remaining 2029 delivery slots and progressively opening 2030, with a US$4.5 billion order-win target for 2026. It is also building Project Hongyuan, a capacity expansion, and an LNG terminal business. The tension is that 2026 deliveries are targeted lower than 2025's, and the group depends on a few large customers and on ordering demand staying firm.

## Key numbers

| Metric | Value | Change | Basis |
| --- | --- | --- | --- |
| Revenue | RMB28.5 billion | up 7.4% from a year ago |  |
| Net profit attributable to equity holders | RMB8.6 billion | up 30.2% from a year ago |  |
| Gross profit margin | 34.2% | up 5.5 ppts from a year ago |  |
| Basic and diluted EPS (RMB cents per share) | 219.23 | up from 167.91 a year ago |  |
| Net cash provided by operating activities (RMB'000) | 4.5B | down from 12,961,071 a year ago |  |

## Segments and operating metrics

| Name | Value | Change |
| --- | --- | --- |
| Shipbuilding revenue | RMB26.8 billion | up 6.4% from a year ago |
| Shipping revenue | RMB1.1 billion | down 8.1% from a year ago |
| Oil tanker construction revenue (RMB'000) | 7,997,466 | up from 3,003,308 a year ago |
| Outstanding orderbook | US$22.4 billion |  |
| Vessels delivered | 56 vessels |  |
| Contract wins | US$2.5 billion | about 80% secured in 2H2025 |

## Outlook

| Metric | Period | Outlook |
| --- | --- | --- |
| Order-win target | FY2026 | US$4.5 billion |

## Key takeaways

1. **Order momentum recovered after a tariff-hit first half** Contract wins of US$2.5 billion for 2025 were about 80% secured in 2H2025, after tariff announcements and macro uncertainty delayed shipowners' ordering decisions earlier in the year. Management says the momentum has carried into 2026.
2. **Orderbook now stretches to 2030 delivery slots** The US$22.4 billion orderbook covers 245 vessels with deliveries from 2026 to 2030. Management is prioritising the remaining 2029 slots while progressively opening 2030, which gives long visibility but means pricing for future slots is being set now.
3. **Product mix shifted toward tankers and gas carriers** Oil tanker construction revenue rose to RMB7,997 million from RMB3,003 million, and gas carrier construction began contributing. The company says demand is rotating from large containerships toward mid-sized containerships and oil tankers.
4. **YAMIC repositioning toward gas carriers is paying off** The Yangzi-Mitsui joint venture was repositioned in 2024 toward higher-end gas carriers, which are now about 49% of its orderbook by contract value. Its revenue and net profit both grew in FY2025, and it delivered 11 of the group's 56 vessels.
5. **Capacity expansion and LNG terminal are under construction** Project Hongyuan is due to complete by end-2026, with steel fabrication already begun in 1Q2026, alongside an LNG terminal business (~RMB3.0 billion capex) and LNG storage tank facilities (~RMB2.0 billion capex). The earlier Project Runze expansion was terminated in 2025, which is why the 2026 delivery target is lower.

## Questions

**What is Yangzijiang Shipbuilding's order target for 2026 and which delivery slots is it selling?** It set a 2026 order-win target of US$4.5 billion, up from US$2.5 billion won in 2025. It is focused on securing the remaining 2029 delivery slots while progressively opening 2030 positions.
**What changed in demand for Yangzijiang's vessels during 2025?** Ordering was delayed in 1H2025 by tariff announcements and macro uncertainty, then recovered in 2H2025, when about 80% of the year's contract wins were secured. Management cites fleet replacement needs and a rotation from large containerships toward mid-sized containerships and oil tankers.
**What vessel types make up Yangzijiang's orderbook?** Containerships are the largest group with 130 vessels, followed by 49 bulk carriers, 40 oil tankers and 26 LPG, VLAC and VLEC gas carriers. Green vessels account for about 71% of orderbook value.
**What expansion projects is Yangzijiang pursuing?** Project Hongyuan, a shipyard capacity expansion, is scheduled for completion by end-2026, and an LNG terminal and LNG storage tank facilities are under construction for completion by end-2026 and 1H2027 respectively. The earlier Project Runze expansion was terminated in 2025.
**Why is Yangzijiang's 2026 delivery target lower than 2025's?** The target is 56 vessels, down from 58 previously targeted for 2025. The company attributes the lower target mainly to excluding the capacity expansion once planned under Project Runze, and says 2026 deliveries mainly come from orders placed in 2023 and 2024.

## Slides and investor documents

- [FY2025 Results Presentation](https://links.sgx.com/1.0.0/corporate-announcements/Q6SS5EC3E8G7V1QB/875966_YZJSH_FY2025%20Results%20Presentation_Final.pdf) (Slide deck)