## In brief

Sembcorp agreed to acquire Alinta Energy, adding an Australian platform, while expanding renewables to 20.4GW and winning data centre power demand in Singapore.

Sembcorp's operational renewables capacity rose from 13.1GW to 15.0GW, with 3.6GW of new projects secured since end 2024, spanning India, Oman, Singapore, Vietnam and Indonesia. In Singapore, it signed 120MW of new long-term power contracts in 2025 and a further 150MW with Micron in January 2026. It also supplies Meta Platforms' subsidiary and DayOne data centres under long-term clean power deals, and it exited the Southeast Asian rooftop solar business.
Management is steering toward a broader earnings base through Alinta Energy, expected to complete by the end of 1H2026, and toward AI-driven power demand. The main tension is Singapore power: new supply is narrowing spark spreads as contracts are re-contracted, including about half of Senoko Energy's portfolio. China renewables face curtailment, tariff pressure and the end of a VAT refund for onshore wind, and UK customer closures weigh on Teesside.

## Key numbers

| Metric | Value | Change | Basis |
| --- | --- | --- | --- |
| Revenue (turnover) | S$5.8 billion | 10% lower than S$6.4 billion in FY2024 | GAAP |
| Net profit from continuing operations | S$984 million | 4% lower year-on-year | GAAP |
| Underlying net profit | S$1.0 billion | comparable to FY2024 | non-GAAP |
| Diluted EPS (cents) | 54.71 | down 2% from 56.10 | GAAP |
| Free cash flow (S$ million) | 2,070 | up from 1,790 in FY2024 |  |

## Segments and operating metrics

| Name | Value | Change |
| --- | --- | --- |
| Gas and Related Services net profit | S$701 million | 4% lower |
| Renewables net profit before exceptional items | S$192 million | 5% higher |
| Integrated Urban Solutions net profit before exceptional items | S$178 million | 3% higher |
| Renewables operational capacity | 15.0GW | up from 13.1GW as of end 2024 |

## Outlook

| Metric | Period | Outlook |
| --- | --- | --- |
| Share of Sembcorp's Singapore portfolio to be re-contracted | 2026 | 5% |

## Key takeaways

1. **Alinta Energy acquisition adds an Australian platform** Shareholders approved the deal and completion is expected by the end of 1H2026. Management says it broadens recurring cash flow and supports its plan to sustain dividends over time, adding an OECD market to a portfolio centred on Singapore, India, China and the UK.
2. **Renewables pipeline now totals 20.4GW gross** Operational capacity rose from 13.1GW to 15.0GW, with new capacity coming online progressively between 2026 and 2030. Growth is concentrated in India, the Middle East and Singapore, including a 125MW Oman wind project with a 20-year PPA.
3. **Data centres and tech manufacturing drive Singapore demand** Gas and Related Services supplies one-third of current Singapore data centre energy demand and over 690MW to high-tech manufacturing, including the new 150MW Micron contract. A 600MW hydrogen-ready plant is due in 4Q2026 to improve fleet fuel efficiency.
4. **Tailored clean power deals target hyperscale customers** Sembcorp signed a 25-year agreement with a Meta Platforms subsidiary for a 150MWp floating solar farm, and a 10-year PPA backed by Renewable Energy Certificates for DayOne's 20MW data centre. The Tembesi Innovation District in Indonesia can host up to 100MW of data centre capacity.
5. **China renewables and Singapore re-contracting are main headwinds** China faces elevated curtailment, tariff pressure and cancellation of the VAT refund for onshore wind, while about half of Senoko Energy's portfolio is re-contracted at lower spark spreads. Management points to contracted positions, with 79% of the Sembcorp portfolio contracted for five years and above, as the offset.

## Questions

**What is Sembcorp's biggest strategic move?** It agreed to acquire Alinta Energy of Australia, with shareholder approval obtained and completion expected by the end of 1H2026. Management says it broadens recurring cash flow and supports sustaining dividends.
**How is Sembcorp benefiting from AI and data centre demand?** It supplies one-third of current Singapore data centre energy demand and over 690MW to high-tech manufacturing, including a new 150MW Micron contract. It also signed renewable supply deals with a Meta Platforms subsidiary and DayOne.
**How large is Sembcorp's renewables business now?** Operational renewables capacity reached 15.0GW from 13.1GW a year earlier, and gross capacity including projects under construction is 20.4GW. 3.6GW was secured since end 2024.
**What are the main risks to Sembcorp's plans?** New supply in Singapore is lowering spark spreads as contracts are renewed, and China renewables face curtailment, tariff pressure and the end of a VAT refund for onshore wind. In the UK, closures of key customers' operations hit demand.
**What is happening in Sembcorp's urban business?** Industrial leasable area occupancy rose to 96% from 76%, and the company is building ready-built factories targeted to deliver recurring income after completion in 2027. It also sold SembEnviro and is divesting a municipal water business in China.