# Rio Tinto (RIO) Q2 2026 earnings

Results filed 2026-08-03 for the quarter ended 2026-06-30. Source page: https://earnings.opennash.com/companies/rio/2026-q2/
Press release and documents: https://www.sec.gov/Archives/edgar/data/863064/000086306426000037/0000863064-26-000037-index.htm
> Summaries and transcripts are machine-generated and can contain errors.

## In brief

Rio Tinto's copper business is becoming its growth engine as Oyu Tolgoi ramps up and Simandou's high-grade iron ore starts shipping, with copper EBITDA up 84%.

Copper was the standout this half. Oyu Tolgoi's ramp-up lifted its copper output 31% from a year earlier, and Rio Tinto says it is the top copper EBITDA grower among major peers since 2020. Simandou, the high-grade iron ore project in Guinea, is now shipping. Lithium production rose 53% as new projects arrived early. Aluminium held stable output while managing tariffs and ramping up the newly commissioned AP60 smelter.
Management is steering the group toward copper and lithium, with capex guided up to $11bn in 2026/27. It plans to fund part of this by releasing $5-10bn from its asset base, including a proposed sale of its stake in the Dampier desalination plant. The main tension is execution. Several mega-projects must ramp up at once, Simandou's costs and timing are still in play, and aluminium faces tariffs.

## Key numbers

| Metric | Value | Change | Basis |
| --- | --- | --- | --- |
| Profit after tax, H1 2026 | 7.2B |  | GAAP |
| Underlying EBITDA, H1 2026 | $14.8B | +28% vs H1 2025 | non-GAAP |
| Cash flow from operations, H1 2026 | 9.2B | +32% vs H1 2025 |  |
| Free cash flow, H1 2026 | $3.8B | +75% vs H1 2025 |  |

## Segments and operating metrics

| Name | Value | Change |
| --- | --- | --- |
| Copper underlying EBITDA | 5.7 | +84% |
| Iron Ore underlying EBITDA | 6.8 | -1% |
| Aluminium underlying EBITDA | 3.1 | +31% |
| Lithium underlying EBITDA | 0.2 | +419% |
| Lithium production (LCE, Rio Tinto share) | 27kt | +53% |
| Copper production (consolidated basis) | 442kt | +1% |

## Outlook

| Metric | Period | Outlook |
| --- | --- | --- |
| Copper production (consolidated basis, kt) | 2026 | 800-870 |
| Copper unit cost (c/lb) | 2026 | 30 - 50 |
| Total iron ore sales (Mt, 100% basis) | 2026 | 343-366 |
| Pilbara unit cost ($/t) | 2026 | 23.5 - 25.0 |
| Aluminium production excl. recycling (Mt) | 2026 | 3.25 – 3.45 |
| Lithium production (LCE kt) | 2026 | 61-64 |
| Capital expenditure | 2026/27 | Up to $11bn |
| Capital expenditure | 2028+ | Up to $10bn |

## Key takeaways

1. **Oyu Tolgoi ramp-up is powering copper growth** Oyu Tolgoi copper output rose 31% year on year and the mine is on track for ~500ktpa on average over 2028 to 2036. Kennecott is targeting 40-50% production growth from 2025 to 2028, and the group is targeting 1 Mtpa of copper.
2. **Simandou high-grade iron ore is now shipping** First Simandou sales were 0.4 Mt in the half against 2026 guidance of 5-10 Mt, giving Rio Tinto more exposure to mid- and high-grade markets. Management targets a ~75-to-90-day cycle from mine to China, and Rio Tinto's share of Simandou mine, rail and port spend is $4.6bn in total.
3. **Lithium projects are arriving ahead of plan** Fenix 1B and Sal de Vida were delivered early and Rincon is on plan for full scale. In-flight projects are on track for ~200ktpa of capacity by 2028, with options to reach ~470 to 520ktpa.
4. **Productivity programme is scaling faster than planned** Rio Tinto has 80+ initiatives under way and an executed run rate of $1.3b annualised at end June, with $1.8bn expected by end 2026. Examples include faster drawbell development at Oyu Tolgoi and sharper contractor management in aluminium smelters.
5. **Asset sales fund a copper and lithium tilt** Rio Tinto signed non-binding agreements to sell its Dampier desalination plant stake to Yindjibarndi WaterCo and is pursuing $5-10bn of cash release from its asset base. Growth capital is focused primarily on copper and lithium.

## Questions

**What drove Rio Tinto's copper momentum in the first half of 2026?** Oyu Tolgoi's ramp-up lifted its copper output 31% year on year, and copper EBITDA rose 84%. Rio Tinto says Oyu Tolgoi remains on track for ~500ktpa on average over 2028 to 2036.
**What is the status of the Simandou iron ore project?** Simandou is now shipping high-grade ore, with 0.4 Mt sold in the half against 2026 guidance of 5-10 Mt. Management is targeting a ~75-to-90-day cycle from mine to China.
**How is Rio Tinto expanding in lithium?** Fenix 1B and Sal de Vida were delivered early and Rincon is on plan for full scale. In-flight projects should reach ~200ktpa of capacity by 2028, with options for ~470 to 520ktpa.
**Where is Rio Tinto directing its capital and what is it selling?** Capex is guided up to $11bn in 2026/27, with growth spending focused primarily on copper and lithium. It is pursuing $5-10bn of cash release from its asset base, including a proposed sale of its Dampier desalination plant stake.
**What are the main risks to Rio Tinto's strategy?** Execution across several large projects at once, including Simandou, lithium and copper, is the main risk. Aluminium also faces tariffs, and the Dampier sale is only a non-binding framework, with a binding deal targeted by year end.