# Northrop Grumman (NOC) Q2 2026 earnings

Results filed 2026-07-21 for the quarter ended 2026-06-30. Source page: https://earnings.opennash.com/companies/noc/2026-q2/
Press release and documents: https://www.sec.gov/Archives/edgar/data/1133421/000113342126000033/0001133421-26-000033-index.htm
> Summaries and transcripts are machine-generated and can contain errors.

## In brief

Northrop Grumman's Sentinel, restricted-program and missile-defense awards pushed backlog to a record $105 billion, even as missile investments and GEM 63XL cost growth weighed on Defense and Space.

Demand was strong across the portfolio this quarter. Net awards included $7.6 billion for Sentinel, $4.3 billion for restricted programs, $1.0 billion for F-35, $0.8 billion for Glide Phase Interceptor and $0.7 billion for MESA. Aeronautics Systems grew fastest on B-21 and restricted work, plus a ramp on the E-130J TACAMO program, while F/A-18 production deliveries have finished. Interest in the IBCS air-defense system is building in several countries.
Management is raising its sales outlook and steering toward faster production and more missile work, saying it has invested so capacity is available now. The main tension is execution: the company is spending to mature AARGM-ER production and to develop and qualify the Stand-in Attack Weapon, and GEM 63XL costs rose. Sentinel and a larger production contract, expected to be definitized later this year, will test that plan.

## Key numbers

| Metric | Value | Change | Basis |
| --- | --- | --- | --- |
| Sales | $10.9 billion | up 5% from a year ago | GAAP |
| Net earnings | $1.1B | down 7% from a year ago | GAAP |
| Diluted EPS | $7.68 | down from $8.15 a year ago | GAAP |
| Operating income | $1.1B | down 23% from a year ago | GAAP |
| Operating margin rate | 10.1% | down 370 bps from a year ago | GAAP |
| Net cash provided by operating activities | $1.3B | up 47% from a year ago | GAAP |
| Adjusted free cash flow | $978.0M | up 54% from a year ago | non-GAAP |

## Segments and operating metrics

| Name | Value | Change |
| --- | --- | --- |
| Aeronautics Systems sales | $3,519 | up 13% |
| Defense Systems sales | $2,093 | up 5% |
| Mission Systems sales | $3,250 | up 3% |
| Space Systems sales | $2,753 | up 4% |
| Total backlog | $104.7 billion | up 9% from December 31, 2025 |

## Outlook

| Metric | Period | Outlook |
| --- | --- | --- |
| Sales | 2026 | $43,750 — $44,250 |
| MTM-adjusted EPS | 2026 | $28.60 — $29.10 |
| Segment operating income | 2026 | $4,850 — $5,000 |
| Adjusted free cash flow | 2026 | $3,100 — $3,500 |

## Key takeaways

1. **Sentinel dominated a record award quarter** Sentinel won $7.6 billion of the $20.0 billion in net awards, lifting Defense Systems backlog 25% since year-end. Sentinel also drove Defense Systems sales as the program continues to ramp.
2. **Aeronautics growth led by B-21 and TACAMO** Aeronautics Systems sales rose 13% on higher volume on B-21 and other restricted programs, B-2, F-35 and E-2. E-130J TACAMO added $106 million as it ramps up, offsetting the end of F/A-18 production deliveries.
3. **Missile prime ambitions carry near-term costs** Northrop Grumman is investing to mature AARGM-ER production and to develop and qualify the Stand-in Attack Weapon, producing a $68 million unfavorable adjustment on SiAW. It signals a push to become a larger missile prime.
4. **Space growth tempered by GEM 63XL overrun** Space Systems gained from Commercial Resupply Service missions and higher volume on Glide Phase Interceptor and Ground-based Midcourse Defense. A $91 million unfavorable adjustment on GEM 63XL reflected higher projected cost to complete.
5. **Missile defense and IBCS demand is broadening** Glide Phase Interceptor won $0.8 billion in awards, and IBCS volume rose in Defense Systems. Management said momentum is building in numerous countries to acquire IBCS, pointing to international demand.

## Questions

**What were Northrop Grumman's biggest contract wins this quarter?** Sentinel led with $7.6 billion, followed by $4.3 billion for restricted programs, $1.0 billion for F-35, $0.8 billion for Glide Phase Interceptor and $0.7 billion for MESA. Net awards were $20.0 billion and backlog reached $104.7 billion.
**Which Northrop Grumman programs are ramping up?** Sentinel and IBCS are growing in Defense Systems, and E-130J TACAMO and B-21 are growing in Aeronautics Systems. Glide Phase Interceptor and Commercial Resupply Service missions are driving Space Systems growth.
**What problems showed up in Northrop Grumman's programs this quarter?** Space Systems took a $91 million unfavorable adjustment on GEM 63XL because of higher projected cost to complete. Defense Systems took a $68 million unfavorable adjustment on SiAW as it develops and qualifies the weapon and matures AARGM-ER production.
**How is demand for IBCS developing outside the U.S.?** Management said momentum continues to build in numerous countries to acquire IBCS, which it describes as proven and operational today. IBCS portfolio volume also rose in Defense Systems.
**How did Northrop Grumman change its 2026 outlook?** It raised 2026 sales guidance by $250 million and MTM-adjusted EPS guidance by $1.20, while reaffirming operating income and adjusted free cash flow guidance. Segment outlooks were lifted for Aeronautics and Mission Systems and trimmed for Space Systems margin.

