# Enbridge (ENB) Q2 2026 earnings

Results filed 2026-07-31 for the quarter ended 2026-06-30. Source page: https://earnings.opennash.com/companies/enb/2026-q2/
Press release and documents: https://www.sec.gov/Archives/edgar/data/895728/000119312526326744/0001193125-26-326744-index.htm
> Summaries and transcripts are machine-generated and can contain errors.

## In brief

Enbridge sanctioned US$1.0 billion Line 5 Relocation and 2.6 Bcf/d Bay Runner Twin, lifting its secured growth backlog to $41B as gas, oil and power demand converge.

Enbridge added about $1 billion to its backlog this quarter and has sanctioned $9 billion of projects year-to-date. It sanctioned the Line 5 Relocation in Wisconsin and the Bay Runner Twin, which will carry Permian gas to Rio Grande LNG under take-or-pay contracts. It signed an option on the TTC Connector, brought the Houston Oil Terminal into service, and drew more interest than expected in the Project Beacon open season on Algonquin.
Management says it will pursue Western Canadian oil egress, expansions on the gas network and more renewables for Meta, calling this the best growth backdrop in a decade. It aims to extend its 5% growth outlook. The tension is timing and funding: Canadian oil expansions depend on government policy clarity later this year, and the Debt-to-EBITDA ratio of 5.1x is elevated while the backlog is financed.

## Key numbers

| Metric | Value | Change | Basis |
| --- | --- | --- | --- |
| GAAP earnings attributable to common shareholders | C$1.4 billion | compared with $2.2 billion in 2025 | GAAP |
| GAAP earnings per common share | C$0.64 | compared with $1.00 in 2025 | GAAP |
| Adjusted earnings per common share | C$0.63 | compared with $0.65 in 2025 | non-GAAP |
| Adjusted EBITDA | C$4.8 billion | compared to $4.6 billion in 2025 | non-GAAP |
| Cash provided by operating activities | C$4.1 billion | compared with $3.2 billion in 2025 | GAAP |
| Distributable cash flow | C$2.9 billion | in-line with results in 2025 | non-GAAP |

## Segments and operating metrics

| Name | Value | Change |
| --- | --- | --- |
| Liquids Pipelines adjusted EBITDA (C$ millions) | 2,341 | vs 2,336 a year ago |
| Gas Distribution and Storage adjusted EBITDA (C$ millions) | 878 | vs 840 a year ago |
| Renewable Power Generation adjusted EBITDA (C$ millions) | 131 | vs 120 a year ago |
| Secured growth project backlog | $41 billion | added $1 billion in the quarter |

## Outlook

| Metric | Period | Outlook |
| --- | --- | --- |
| Adjusted EBITDA | 2026 | between $20.2 billion and $20.8 billion |
| DCF per share | 2026 | between $5.70 and $6.10 |
| Near-term average compound annual growth rate for adjusted EBITDA, DCF per share and EPS | post-2026 | approximately 5% |
| Annual growth capital investment capacity | annual | $10 to $11 billion |

## Key takeaways

1. **Line 5 Relocation is sanctioned and under construction** The US$1.0 billion, 41-mile Wisconsin re-route has its key state and federal permits, including the Army Corps Clean Water Act permit, and is expected in service in early 2027. It strengthens supply reliability to the Midwest, Ontario and Quebec and adds Recoverable Line 5 Capital to Mainline rate base.
2. **LNG feed gas is driving Gas Transmission growth** The 2.6 Bcf/d Bay Runner Twin brings Permian gas to Rio Grande LNG, backed by long-term take-or-pay agreements and expected in service by 2030. Enbridge also signed an exclusive option on the TTC Connector, which links Tres Palacios to Freeport LNG with bp holding all capacity.
3. **Project Beacon demand exceeded initial expectations** The Algonquin Gas Transmission open season for more Northeast capacity drew significantly more interest than Enbridge expected. The company is working to commercialize a potential expansion, which points to continued regional demand.
4. **Canadian oil egress opportunities are broadening** Mainline Optimization Phase 2 has become a wider set of expansion options as Canadian production rises. Enbridge's Regional Oil Sands system serves about 50% of Alberta oil sands output, though sanctioning depends on government policy clarity later this year.
5. **Renewables growth is anchored by Meta contracts** Renewable Power is advancing over 1.5 GW of safe harboured opportunities after sanctioning over 1.4 GW of solar and wind and 1.6 GWh of storage in the past 12 months, all under long-term Meta power purchase agreements. More sanctions are expected this year.

## Questions

**What major projects did Enbridge sanction in Q2 2026?** It sanctioned the US$1.0 billion Line 5 Relocation in Wisconsin and, with partners in the Whistler Joint Venture, the 2.6 Bcf/d Bay Runner Twin pipeline supplying Rio Grande LNG. Year-to-date sanctioned projects total $9 billion.
**How big is Enbridge's secured backlog and how will it be funded?** The secured growth backlog is about $41 billion. Enbridge expects to finance it from $10 to $11 billion of annual growth capital investment capacity.
**What is the TTC Connector deal?** Enbridge signed an exclusive option to buy the TTC Connector, a 25-mile, 300 MMcf/d pipeline linking Tres Palacios Gas Storage to Freeport LNG, with long-term agreements with bp for all capacity. Enbridge can acquire it once it enters service, which is expected by the end of the year.
**Where does Enbridge see oil growth coming from?** It expects rising Western Canadian production to drive Mainline optimizations and expansions on its Regional Oil Sands, Southern Lights and Norlite systems. Management is waiting for greater clarity on supportive government policies later this year.
**What is Enbridge's guidance and outlook position?** It reaffirmed 2026 financial guidance and its medium-term outlook of roughly 5% annual growth, and says it will work to extend that outlook further. Management targets $10-20 billion of new project announcements over 2026 to 2027.

## Slides and investor documents

- [2026 Q2 Financials and MD&A](https://www.enbridge.com/~/media/Enb/Documents/Investor-Relations/2026/2026_Q2_Financial_Statements_MDA_Final.pdf?rev=f972cf5b06b74c8a96bcddf9405fbf2f&hash=FC1B18C9A3E4BD461ABAC3F49EB45351) (Financial tables)
- [2026 Q2 Supplemental Package](https://www.enbridge.com/~/media/Enb/Documents/Investor-Relations/2026/2026_Q2_Supplemental_Package_Final.pdf?rev=c049978debf34f5eb7c2bdc38ec56b14&hash=2D99B6C40FE7CF4BF88EA8C8FEE0AA70) (Financial tables)

